To contribute to this wiki, please contact bikebikeeverywhere@gmail.com if you would like us to create you an account. The Contribute to this Wiki page goes into detail about how to make contributions and what information should be included.
Para contribuir a este wiki, por favor escribe a bikebikeeverywhere@gmail.com si deseas que creemos una cuenta para ti. La página Contribute to this Wiki explica en detalle cómo hacer contribuciones y qué información debe incluirse.
SLCBC Intermodal Hub Bike Transit Center TE Application
1.1 NAME OR TITLE
Intermodal Hub BikeStation - Salt Lake
1.2 PROJECT LOCATION AND LENGTH
The proposed BikeStation would be located in the downtown Salt Lake City Intermodal Hub, which is along 600 west near 300 sourth. The project would have two phases. The first would be a feasibility and preliminary design study done by the BikeStation Coalition consulting group. Pending the results of that study, the second phase would be the build out in the Intermodal Hub as well as establishing initial operations.
For a more in-depth project overview visit the website: http://www.slcbikecollective.org/bikestation.php
1.3 PROJECT SPONSOR(S)
Lead Sponsor: UTA Rideshare
Co-Sponsor(s): Salt Lake City Corporation and the Salt Lake City Bicycle Collective
1.4 APPLICATION CONTACT PERSON(S)
(1) Shaina Miron Quinn Title: Regional Marketing Specialist / UTA Rideshare Address: 3600 South 700 West City: SLC State: UT Zip: 84130 Phone: 801-287-2066 Fax: 801-262-8031
(2) Jonathan L. Morrison Title: Project Coordinator / Salt Lake City Bicycle Collective Address: 2312 S. West Temple City: SLC State: UT Zip: 84115 Phone: 801-328-2453 Fax: 801-466-3856
(3) Jordan Gates Title: Environmental Advisor to the Mayor / Salt Lake City Corporation Address: 451 S. State St. #306 City: SLC State: UT Zip: 84111 Phone: 801-535-7939 Fax: 801-535-6331
1.5 Funding Request
A = FEDERAL FUNDS REQUESTED = $ B = ALL CASH REQUIRED PLUS FLEX (SOFT) MATCH = $
SPONSOR MATCH = B / (A+B)X 100% =
Shaina - How much is the space worth in rent?
1.6 Statement of Intent to Fund, Pursue Reasonable Progress and Maintain
Shaina -- Any problems with the legal liability?
1.7 Enhancement Categories by Group
Bicycle and Pedestrian
100% Facilities for pedestrians and bicycles, check system type below
X Major Regional system X Local/Link to Regional X Local System
George -- What is a Local System?
1.8 Executive Summary
Provide a concise overview within the remaining space provided on this page only answering the "Technical Scope or what" is your project. Other sections are provided for the benefits and users of the proposed project. When possible list quantity details such as project length, area improved, improvement to resource etc.
George -- Is this different than section 1.2?
2.0 Application Inventory
2.1 Please check the appropriate box for each question or cross out if Non Applicable. You may insert a sentence of explanation for "No" answers in the space provided below that question:
2.2 Sponsor Experience with any Federal Aid Programs
Briefly describe sponsor's experience with federal funded programs. Include specific staff by name if assigned to this project.
UTA -- Bike Lockers Salt Lake City Bicycle Collective -- BikeEd Program
2.4 Environmental and Cultural Resource Inventory
3.0 Project Purpose, Benefits and Direct Affects
Use and arrange the spacing over the next two pages as needed to answer sections 3 & 4. Do not exceed two pages.
3.1 Describe the fundamental purpose and need for the proposed project:
Why is there a project? The project purpose solves or meets a need of your community, county or state. Parts of this section may be redundant. That is OK. Section 3.1 is the most important sub section here and should be the foundation and support for the complete proposal.